Mobile folding container houses are suitable for various application scenarios, such as temporary offices, exhibition halls, field camps, emergency rescue, etc. It can be deployed quickly, enabling people to acquire a home and work space in a short period of time. In addition, the mobile folding container house also has the advantages of easy transportation, space saving and environmental protection. It can be quickly relocated by loading it on a truck, boat or plane to easily respond to the needs of different locations. The design of this kind of house also needs to consider the stability of the structure, windproof and waterproof, thermal insulation and other functions, so as to provide a good living and working environment.
Item No :
FC15Order(MOQ) :
5Payment :
Telegraphic TransferProduct Origin :
ChinaColor :
CustomizedShipping Port :
Guangzhou/Shenzhen/FoshanLead Time :
3-15Guizu Prefab House Quick Installation Movable Foldable Container Home
The mobile folding container house is a type of house that can be folded and moved quickly. It is usually composed of foldable and assembled structures, which can be easily set up and dismantled to suit different places and needs. This kind of house can be expanded and contracted according to needs, with flexibility and adjustability.
Product Specification
Configuration - Standard Folding Container |
||
Specification |
external dimension (mm) |
5800*2480*2560 |
Internal dimension (mm) |
5640*2320*2420 |
|
Package dimension (mm) |
5800*2480*410 |
|
Weight |
≈1300KG |
|
Index |
Structural Design Service Life |
10 years |
ground live load |
200kg/㎡ |
|
roof live load |
100kg/㎡ |
|
wind load |
Grade 8 |
|
Seismic Fortification Intensity |
Grade 10 |
|
Main structure |
Top frame |
Main beam Q235B rectangular square tube |
Secondary beam Q235B rectangular square tube |
||
Secondary beam Q235B rectangular square tube |
||
Bottom frame |
Main beam Q235B rectangular square tube |
|
Main beam Q235B rectangular square tube |
||
Secondary beam Q235B rectangular square tube |
||
side |
Main beam Q235B galvanized P-type pipe |
|
front and back |
Main beam Q235B galvanized P-type pipe |
|
corner |
Q235B thickness 8mm |
|
folding hinge |
Galvanized hinge, high strength |
|
Roof |
Integral frame protective coating |
Electrostatic spray/straight white plastic powder |
external roof |
Galvanized sheet |
|
interior ceiling |
Color steel veneer V831,0.37mm |
|
Wall panel |
Insulation glass wool |
glass wool roll 50mm |
side wall |
0.3/0.3 75mm Thick glass wool composite board |
|
Front and rear wall panels |
0.3/0.3 75mm Thick glass wool composite board |
|
Floor |
cement mix floor 15mm |
|
Electrical System |
Electrical wiring is installed in strict accordance with moisture-proof specifications, and all electrical products meet CE certification. Connect the circuit according to the circuit engineering specification, indoor: 4² national standard annealed copper wire, 1 32A circuit breaker, 1 three-hole air-conditioning socket, 2.5² socket incoming line, 1 five-hole single-open socket, 1 five-hole socket, 1 LED light |
|
door |
High quality anti-theft door (warm white) size: 860mm*1990mm |
|
window |
920*920 single glass sliding window plastic steel window with guardrail screen window, glass thickness 4mm |
Interior design
product installation
The production and assembly of all the components of the folding container house are prefabricated at the factory. You can install the Folding House on the job site in just four steps.
1. Use the crane to live its roof. Lift its roof slowly until the house is unfolded and stop the crane there.
2. Expand the front and back walls of the container. Push the front and back from inside, and make it stand in the correct place.
3. Use the bolts to fix the whole structure. There will be premade bolt holes on the columns, and we will provide enough bolts for you to fix them.
4. Install the door lock. To prevent the door lock from damaging the ceiling during the folding process, we will not install the door lock in advance. If you need to move the house to another place and need to fold it, please remember to take down the door lock in advance also.
Supporting Facilities
Tags :
Hi! Click one of our members below to chat on