The folding container disaster relief houses have the advantages of quick construction, portability, and reusability, due to their simple structure and material limitations, their heat insulation, protection, and privacy may not be as good as traditional houses. Therefore, the use scenarios, constraints and actual needs of victims need to be considered during the design and construction process. At the same time, it is necessary to pay attention to safety and hygiene during use, and to maintain and update in time.
Item No :
FC10Order(MOQ) :
5Payment :
Telegraphic TransferProduct Origin :
ChinaColor :
CustomizedShipping Port :
Guangzhou/Shenzhen/FoshanLead Time :
3-15Fast-Produce Turkey Temporary Prefab Rescue Container House
Rescue container houses are usually a type of house designed for emergencies such as natural disasters, wars, and refugee crises. It is characterized by quick deployment and assembly, easy transportation and relocation, shockproof and windproof, durable and reusable. Rescue container houses can be used as temporary housing, medical facilities, education centers or community activity centers, etc., to provide the basic living conditions and basic services required by survivors. These houses are usually standard-sized shipping containers, which can be customized in different configurations and outfits according to different needs and scenarios. For example, rescue container houses are usually equipped with power equipment, toilets, kitchens, beds and other equipment to meet the basic living needs of victims.
Product Specification
Configuration - Standard Folding Container |
||
Specification |
external dimension (mm) |
5800*2480*2560 |
Internal dimension (mm) |
5640*2320*2420 |
|
Package dimension (mm) |
5800*2480*410 |
|
Weight |
≈1300KG |
|
Index |
Structural Design Service Life |
10 years |
ground live load |
200kg/㎡ |
|
roof live load |
100kg/㎡ |
|
wind load |
Grade 8 |
|
Seismic Fortification Intensity |
Grade 10 |
|
Main structure |
Top frame |
Main beam Q235B rectangular square tube |
Secondary beam Q235B rectangular square tube |
||
Secondary beam Q235B rectangular square tube |
||
Bottom frame |
Main beam Q235B rectangular square tube |
|
Main beam Q235B rectangular square tube |
||
Secondary beam Q235B rectangular square tube |
||
side |
Main beam Q235B galvanized P-type pipe |
|
front and back |
Main beam Q235B galvanized P-type pipe |
|
corner |
Q235B thickness 8mm |
|
folding hinge |
Galvanized hinge, high strength |
|
Roof |
Integral frame protective coating |
Electrostatic spray/straight white plastic powder |
external roof |
Galvanized sheet |
|
interior ceiling |
Color steel veneer V831,0.37mm |
|
Wall panel |
Insulation glass wool |
glass wool roll 50mm |
side wall |
0.3/0.3 75mm Thick glass wool composite board |
|
Front and rear wall panels |
0.3/0.3 75mm Thick glass wool composite board |
|
Floor |
cement mix floor 15mm |
|
Electrical System |
Electrical wiring is installed in strict accordance with moisture-proof specifications, and all electrical products meet CE certification. Connect the circuit according to the circuit engineering specification, indoor: 4² national standard annealed copper wire, 1 32A circuit breaker, 1 three-hole air-conditioning socket, 2.5² socket incoming line, 1 five-hole single-open socket, 1 five-hole socket, 1 LED light |
|
door |
High quality anti-theft door (warm white) size: 860mm*1990mm |
|
window |
920*920 single glass sliding window plastic steel window with guardrail screen window, glass thickness 4mm |
Interior design
product installation
The production and assembly of all the components of the folding container house are prefabricated at the factory. You can install the Folding House on the job site in just four steps.
1. Use the crane to live its roof. Lift its roof slowly until the house is unfolded and stop the crane there.
2. Expand the front and back walls of the container. Push the front and back from inside, and make it stand in the correct place.
3. Use the bolts to fix the whole structure. There will be premade bolt holes on the columns, and we will provide enough bolts for you to fix them.
4. Install the door lock. To prevent the door lock from damaging the ceiling during the folding process, we will not install the door lock in advance. If you need to move the house to another place and need to fold it, please remember to take down the door lock in advance also.
Supporting Facilities
Tags :
Hi! Click one of our members below to chat on